Excavator break hammer storage method

图片1 拷贝

Excavator break hammer as a common equipment, its general normal use is not a big problem, but in the case of long-term use, it will have more or less a certain impact on its own performance, especially in the case of improper storage, therefore, the correct understanding of the crusher equipment storage precautions is very necessary.

Introduction of long-term storage method of excavator break hammer:

No.1: Storage should be parked in a dry indoor, forced to stop in the outdoor, 25 break hammer hose, should choose a flat ground and covered with wood. Cover with a cloth after parking.

The arrangement and arrangement at the parking airport during storage should ensure that the entry and exit of any machine is not affected by other machines.

No.2: When stored, the fuel control lever of the machine should be placed in the idle position, and each joystick should be placed in the neutral position.

No.3: Before long-term storage, it is necessary to maintain the machinery, repair the damaged parts, and completely clean it, and keep the technical condition in good condition.

No.4: The battery should be removed before storage, put the battery in a dry and anti-freezing place, to keep its surface clean and dry, do not place conductive objects on the battery.

No.5: The cooling water in the engine should be discharged before storage, the engine oil should be replaced, and the engine should be started once a month during the shutdown period to make the machinery travel a short distance, so that the lubrication of each part to establish a new oil film to prevent rust. Note: The cooling water should be filled before starting, and the cooling water should be drained at the end.

In addition, when the crusher is stored, if it is in a low temperature environment, it must be stored after lubrication with low viscosity grease, so that the internal parts of the crusher are well lubricated to prevent serious friction between the parts and cause damage to the parts.

No.6: The iron pipe part of the crushing hammer pipeline must be selected after pickling and phosphating, only in this way can ensure that the break hammer is not pulled!


Post time: Nov-11-2024