Three elements of saving money and reducing costs:
No.1:Most of the main models in the market are small excavators , the main models are 5~15 tons, in order to satisfy the needs of customers to save money , manufacturers can replace these models of excavator wood grab from two oil cylinders into an oil cylinder, normal customers are used to grab wood, to grab materials are not too heavy, In addition, the type and weight of the excavator do not allow it to grab too much, otherwise it will tilt its butt, so the use of a single cylinder grab can not only meet customer requirements, but also save customers' investment costs!
No.2:The traditional installation of the excavator wood grab requires five pipes to drive, if the customer excavator itself has a crushing hammer pipeline, can we use the two pipes of the crushing hammer to achieve the rotating tensioning action of the excavator wood grab? The answer is yes, the excavator wood grab manufacturers can integrate the solenoid valve and valve block on the pipe to the wood grab, the installation customer only needs to connect the crushing hammer pipeline, and then the control wire can be connected to the action, so that not only the production of wood grab manufacturers can save costs, customers can save money and save installation costs (smart customers can install themselves, Easy small series telephone guidance). The manufacturer should pay attention to the fixing method of the solenoid valve and the valve block, otherwise there will be oil leakage of the valve block!
No.3:In fact, the motor in the domestic technology has been relatively mature, the failure rate is very low, and the cost is one third of the import is enough, the domestic motor manufacturers know more about the working conditions of domestic customers, suitable is the king.
Post time: Dec-02-2024